Service Contract No. 63 – East Sabina

Project Location : Offshore Southwest Palawan

JV Partners and Percent Equity :  Nido Petroleum Ltd. (Operator) 50%, PNOC EC  50%

Project Description : SC 63 was jointly bidded and awarded to PNOC EC and Nido Petroleum on 24 November 2006 with each holding 50% interest. It covers an area of 5,280 km2 in offshore Southwest Palawan, south of SC 75.

In 2014, Dragon Oil farmed-in acquiring 40% interest while PNOC EC’s interest was reduced to 40% and Nido to 20%. Following Dragon Oil’s withdrawal from the service contract effective December 2017, PNOC EC now holds a 50% interest while Nido Petroleum Ltd. has 50% and operatorship.

 

Brief Background : As part of the SC 63 commitment, 3,254 km 2D and 754 km2 3D seismic data were acquired over the area from 2007 to 2010 with focus around the Abo-abo well, which flowed gas when drilled in the early 80’s.  Several interesting drillable targets were mapped co-relatable to the Abo-abo discovery. The presence of an active petroleum system attracted Dragon, which led to their farm-in.

The Baragatan-1A well was drilled in May to July 2014 and encountered several thin gas-charged zones, which were deemed non-commercial.  In November 2015, Dragon decided to withdraw from the block.

On 10 March 2016, the DOE granted a three-year (3) technical moratorium from November 2015 to November 2018 to allow the partners to further study the block prior to committing to drill a well.


As of May 2018

(page update May 22, 2018)